All 14 checkpoints overdue; Google Workspace SSO added without timeline adjustment; velocity at 33% of target.
Immediately convene a project reset meeting with engineering leadership and PM to re-baseline the entire Auth v2 timeline given the 7+ month overrun. Descope Google Workspace SSO from the current effort and defer to a follow-on phase. Prioritize AUTH-12 (SAML conformance) to unblock the SAML adapter checkpoint, and assign a dedicated engineer to respond to Priya's status request within 24 hours.
Scope drift
Reasoning
The goal deadline was 2025-09-30, which is now 214 days overdue (today is 2026-05-02). All 14 checkpoints across all four epics remain pending and overdue, with the earliest checkpoint (Design provider interface) due 2025-07-15. This triggers the `off_track` rule: "2+ checkpoints overdue". Additionally, on 2026-04-24 Sarah proposed adding Google Workspace SSO (slack:msg:1745.001), and Marcus agreed on 2026-04-25 (slack:msg:1745.014) with explicit decision "Added to scope without timeline adjustment" — this is documented scope expansion without timeline adjustment, triggering `at_risk` criteria. Weekly velocity summary on 2026-04-28 (github:digest:2026-04-28) shows 1 PR merged against a target of 3 (33% of target, a 67% drop). AUTH-12 estimate was revised from 5 to 8 days (60% increase) on 2026-04-30 (linear:event:AUTH-12-inprogress). PM Priya's status request on 2026-04-29 (slack:msg:1748.022) has zero replies for 3 days, constituting an unaddressed blocker with deadline <30 days away (though the original deadline has already passed).
Open
3
Overdue
0
Done
0
Total
3
Epics
4
Checkpoints
14
Risks
5
Success criteria
5